In Scottsdale's boulder country, rock can be the whole job. Rock slows a dig down, changes the equipment needed and makes quotes harder to pin down. This page covers how rock is priced and what the city expects around boulder features.

Excavator with a hydraulic breaker working in a rocky cut
A hydraulic breaker on an excavator, the usual tool for rock a bucket can't dig. Stock photo: ELG21 / Pixabay, Pixabay Content License.

What rock work costs

Rock and hard-ground excavation prices, 2026
ItemPublished rangeSource
Rock or ledge removal$1,000 to more than $20,000Angi, national
Blasting rock$40 to $100 per cubic yardAngi, national
Rocky or clay-heavy soilAdds $200 to $1,200Angi, national
Hard caliche or other soil-type workAdds $210 to $1,240Angi, Phoenix
Rocky ground on a pool dig$40 to $100 per cubic yardAngi pool guide

Angi's Phoenix guide notes that hard, compacted ground can need heavy-duty breakers. Because nobody knows exactly what's down there until the dig starts, rock is often quoted as an hourly or per-yard allowance.

Blasting is its own license

The Arizona Registrar of Contractors licenses blasting separately, under R-15, C-15 and CR-15, covering drilling, boring and moving earth for excavation with explosives. General excavating and grading is R-2, A-5 or CR-2. If your quote mentions blasting, ask who holds the blasting license.

Boulders in the ESL overlay

Scottsdale's ESL guide says development generally should not intrude on or damage boulder features or major boulders. If construction has to touch one, the design should keep the risk to the boulder and the neighbors low. Boulder outcroppings are among the features the city lists for protection in Natural Area Open Space. See ESL desert lots.

Questions for a rock quote

  • Is rock priced per hour, per yard, or as a fixed allowance?
  • What equipment will be on site: a breaker, a larger excavator, or both?
  • Will broken rock be hauled off, or reused for walls or landscaping?
  • Are there boulders or outcrops on the lot that must be protected?

Questions and answers

How much does rock excavation cost?

Angi's 2026 national guide lists rock or ledge removal at $1,000 to more than $20,000, and blasting at $40 to $100 per cubic yard.

Can I remove boulders on an ESL lot in Scottsdale?

Scottsdale's ESL guide says development generally should not intrude on or damage boulder features or major boulders. Ask the city before planning work that would move one.

Get your rock work quoted

Call or use the form. A local excavation contractor gets back to you, and asking for a quote costs nothing.

Call (602) 584-1476

Reached voicemail? Leave your name, number, the address and a line about the job.